Structure No | 40118 |
Structure Name | Blackwater River Bridge |
Last PI Date | 23-Feb-2009 |
Next PI Date +/- 6 Month | 23-Feb-2015 |
Last GI Date | 22-Apr-2011 |
Next GI Due +/- 6 Month | 31-Oct-2016 |
Route | M1 |
X | 288212 |
Y | 361215 |
Spanning | Blackwater River |
Orientation | W-E |
Skew | 35.00 |
Span Length | 41.08 |
Structure Type | Underbridge – Single span simply supported structure |
Joint Type | Asphaltic Plug |
Parapet | Concrete |
Construction Year | 1964 |
HA_Rating | 40 |
HB_Rating | 45 |